Victorian Railways. Calculations and justification of figures in connection with traction report; memorandum on country lines; and power report
- Component identifier:
- File 189
- Content Summary:
-
Contents:- 1. Suburban lines-capital cost. 2. Suburban lines-annual cost of operation. 3. Country lines-Melbourne-Woodend-Bendigo-capital cost. 4. Country lines-annual cost of operation. 5. Country lines-3000 volts. 6. Country lines-Melbourne-Wallan-Seymour-1500 volts. 7. Power-capital cost. 8. Power-annual cost of operation. 9. Power-Gas Corporation's estimates. 10. Miscellaneous. 11. Technical memorandum.
Typescript. 1 volume. (200p.)
- Processing information:
- M1832
Online content
Access and use
- Parent Restrictions:
- Available for Access.
- Parent Terms of Access:
- Many of the records digitised as part of the AJCP are still in copyright. Readers wishing to publish or reproduce documents should seek permission, in the first instance, from the owner of the original material.
- Location of this collection:
-
Parkes PlaceCanberra ACT 2600, Australia
- Contact: